Project Update October 2026

The project is in Stage One. We have been investigating two options for the future of King’s Pond.

Dredging Plus – the pond would be restored and enhance through silt removal, bank and island strengthening and reprofiling.
River & Pond – this option would see the winterbourne River Wey run through the site alongside a smaller pond, restored as for Dredging Plus

At the end of May 2026 the Council appointed Five Rivers Environmental Contracting Ltd to carry out the preliminary design and costing of both options in preparation for informed public consultation. Their designs are currently being reviewed by the Task & Finish Group. The designs and costings will be collated with other information in preparation for public consultation.

The public consultation will run for a 9-week period commencing on 2nd November.
Pre-publicity for the consultation will commence on 19th October.

During November there will be six Briefings when there will be a presentation of the options and residents will have the opportunity to ask questions. There will also be three Drop-in Sessions when drawings and other information will be on display, and residents will have the opportunity to discuss these with consultants and members of the Task & Finish Group.

There will be an on-line consultation survey managed by Enventure Research, an independent company. They will also receive completed paper survey forms. Enventure will collate and analyse the response received and produce an independent report to Full Council in late January.

Task & Finish Group

The Task & Finish Group is made up of councillors and local residents with relevant skills and interests. The group carries out investigations and develops and implements action plans to progress the project. Minutes of the Task & Finish Group meetings, once approved, can be found under the tab below.  During the preparation work for the Public Consultation, the Task & Finish Group is meeting weekly

The last meeting was held on 30th September 2026.

Community & Stakeholder Group

Primarily this group is for sharing information on King’s Pond. The Task & Finish Group reports on progress for discussion. This group also acts as conduit for community feedback to the Task & Finish Group.

The last meeting was held on 21st  September. The minutes from the previous meetings can be found under Community & Stakeholder Focus Group: Minutes and Presentation tab below. The next meeting, which will be a presentation of the consultation briefing, is on Monday 2nd November

Long -Term Programme Following a decision on which option to adopt, significant time will be needed to complete final designs, to obtain approvals and permissions, to raise funds and to appoint contractors.  Considering also the seasonal timing, any works on site are unlikely to commence before late 2027.


STAGES OF THE PROJECT

 Stage One – To public consultation and decision

  • Pre-application consultation on both options with the planning authority and the Environment Agency.
  • Engineering and landscape design and specification of both options to sufficient detail for costing and for presentation to residents.
  • Ecological strategies for both options to create/improve habitats and improve biodiversity to sufficient detail for costing and presentation to residents
  • Flood Risk Assessment for the River & Pond option only
  • Public consultation & selection of the preferred option.

Stage Two – Design, Approvals, Appointment of a contractor

  • Applications for approvals and permits for the selected option.
  • Landscape and engineering design and specifications progressed to construction detail
  • Preparation of Tender Documents
  • Tendering and selection of a contractor.
  • Sourcing funds

Stage Three – Works on site

Frequently Asked Questions

Project Governance

South East Water

King’s Pond: Briefing Sessions

Task & Finish Group: Terms of Reference

Outline Programme

Archived The Way Forward Briefing Document

The Parish Poll – January 2026

Alton Town Council
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.